Desa Meko

Kec. Pamona Barat, Kab. Poso
Prov. Sulawesi Tengah

Loading

Info
Selamat datang di Website Resmi Desa Meko Kecamatan Pamona Barat Kabupaten Poso Provinsi Sulawesi Tengah

Berita Desa

Komentar Terbaru

Lake Poso is one of the ancient tectonic lakes in Central Sulawesi and is also the main habitat for several species of endemic fish that can only be found in this lake including bungu Poso Mugilogobius amadi (CR) and Buntingi half-duck Adrianichthys kruyti (CR). The threat of changes in catchment areas, pollution, geological phenomena and overfishing make these endemic fish species very difficult to find. During the implementation of the Indonesian Bird Program with the Imunitas Association, one of the activities was the creation of a semi-natural habitat for fish and other aquatic animals, namely "inanco". This concept departs from the traditional model but with a touch of modernization that is making rocks with aisles at the bottom of the lake and stacking wood on it so as to allow for the development and protection and habitat of fish, sogili (eels) and other aquatic animals and plants. This Inanco is made at a depth of 3-5 meters in a lake with good sunlight intensity and penetrates the bottom of the lake in accordance with hereditary knowledge. This concept was made for the preservation of Adrianichthys kruyti bunting fish, Bungu Mugilogobius sarasinorum, and several small fish species, shrimp and crabs and even snails. As a result, one of the species that is rarely found, Bungu Mugilogobius sarasinorum, is now beginning to be encountered frequently in Inanco locations around the mouth of the Meko and Salukai estuaries on the shores of Lake Poso. Further observation is needed on the impact of "Inanco" practices on endemic fish species in Lake Poso and the importance of identifying local wisdom for the conservation and conservation of endemic fish species in Lake Poso.

Poso Regency consists of 19 districts, 28 villages and 142 villages with an area of 8,712.25 km?2; and a population of ± 240,812 people [2] in 2018.
Lake Poso is the third largest lake in Indonesia after Lake Toba in North Sumatra and Lake Towuti in South Sulawesi with an area of 368.9 km?2; (36,890 ha) with a panoramic coastline 127 km at an altitude of 650 meters above sea level, a maximum depth of 384.6 meters, average depth average of 194.7 meters and brightness reaching 10 meters with high biodiversity and the existence of several research references that indicate the existence of endemic fish species in Lake Poso.

Method and Approach

Participatory Conservation Planning (PCP) is used to develop participatory conservation area management plans. PCP identifies conservation priorities in an area in designing efficient and effective conservation strategies. Facilitate the analysis of the human context in conservation and provide indicators of success.
PCP views conservation issues from a general human perspective by examining the area (System), analysis of changes that occur in the system and the stresses and sources of pressure (Sources) that cause the changes to occur. A broader understanding of the community is very useful in the analysis of the parties (stakeholders), as well as in designing strategies that are more likely to achieve success end the indikator.
One of the strengths of PCP lies in its flexibility, where information and prejudices that grow in the process are recorded clearly, in addition, the process can also be repeated routinely, and can also be updated with new information and discoveries. Through the involvement of partners and stakeholders, the PCP process also produces strategies that are more likely to succeed.
Just like the people who live in and around the forests in Indonesia, so do the people around Lake Poso. Communities have very high interests in the region, for example in terms of claims to territorial rights or in terms of local economic links. Where livelihoods are still dependent on natural resources.
The need for community participation in natural resource management is no longer negotiable. As the largest stakeholder, the community around natural resource centers is the group of interests that most determines the success or failure of conservation efforts in an area.
Programs that use the PCP method were carried out in 4 villages namely Meko, Salukai, Owini and Uranosari villages, Pamona Barat District - Poso District to achieve Co-Management of the Lake Poso Watershed. The program is organized into two program components namely; (1) Collaborative management of watersheds, (2) Community empowerment in watershed management.
The implementation of community PCP identifies systems that they think are important and are identified up to 8 systems per village, then all systems are assessed for trends and behaviors by looking at their condition (five to ten years before - now - and the conditions if they continue until 5 or 10 the coming year, looking at the pressure on the system that causes change, the parties involved that influence the system, then formulate strategies for what needs to be done to reduce the pressure and achieve success.

Results and Discussion

The recommendation of the PCP result states that there is a system that changes both the quality and quantity of the system related to the management of the Poso lake. One of them is no longer applied to local knowledge of Inanco.
Inanco is a natural habitat for all fish and animals and other aquatic plants that are made for their natural habitat and breed to ensure the availability of fish stocks, sogili and other lake water animals and plants in the area. This location is a location that has ideal conditions for the development and protection of fish from other predators in the lake by piling rocks and dead wooden sticks at the bottom of the lake. The wood and rocks that are piled up will eventually be overgrown with moss and other plants and water so that it becomes fertile
This condition causes population and growth of fish, sogili and other lake animals better than the old area in the lake and the availability to take is always available. Inanco was indeed protected and regulated for the benefit of the kingdom as a place for fish stocks and royal sogili and the village government at that time.
The collection will only be done when needed as during the harvest party "Padungku", when there are royal guests or guests at the beginning of the reign in Inanco area. Retrieval of time was also with traditional equipment in the form of pana (arrow), fish spear (sarompo), fish trap made from bamboo (bubu), catcher from bamboo (sango), using a hook / fishing rod and unique when fishing for endemic fish bungu Mugilogobius amadi (CR) by using finely woven rattan and fishing hooks on both ends of the rattan and fishing together with the boat during the monsoon season to collect the fish in that location as needed at that time. The location for making Inanco is always the same place until now.
Then this concept of local wisdom above then developed again but with a touch of modernization that is making Boronjong stone with passageways at the bottom of the lake and stacking wood on it so that it allows for the development and protection and habitat of fish, sogili (eels) and other aquatic animals and plants. This Inanco was made at a depth of 3-5 meters in a lake with good sun-shining intensity and redeemed the bottom of the lake in accordance with the former location of Inanco in the previous royal era.
Then this concept of local wisdom above then developed again but with a touch of modernization that is making Boronjong stone with passageways at the bottom of the lake and stacking wood on it so as to allow for the development and protection and habitat of fish, sogili (eel) and other animals and aquatic plants. This Inanco was made at a depth of 3-5 meters in a lake with good sun-shining intensity and redeemed the bottom of the lake in accordance with the former location of Inanco in the previous royal era.

This concept was made for the preservation of endemic species of Lake Poso, namely buntingi half-duck Adrianichthys kruyti (CR) (Weber, 1913), bungu fish Mugilogobius amadi (CR), and several small fish species, shrimp and crabs and even snails.

The manufacturing process steps are:

Results and Discussion
Preparation :
1. Gabion weaving
2. Taking wood and stone
3. Transportation of gabion wire and wood

Installation:
1. Installation of retaining poles
2. Installation of boronjong at the bottom of the lake
3. Installation of wooden boards and beams
4. Laying the retaining stone on the beam board

Since this process was made in 2017, one of the species that has been stepped up is that the Bungu Mugilogobius amadi (CR) fish has now begun to have a lot of pupulation and is often encountered around the mouths of the Meko and Salukai rivers close to the Inanco location created by the Lake Conservation Group Meko and Salukai villages which are also accompanied by with the agreement of the village as a result of Participatory Conservation Planning (PCP) which one of the agreements regulates the use of environmentally friendly fishing gear and an agreement not to dispose of and wash the tankers and tools contaminated (poisons) pesticides, herbicides, etc. in the river as well as watershed and catchment areas protection agreements and even agreements its rehabilitation by reforestation and planting of river bank reinforcement plants for farmers bordering directly on the Meko river and Salukai river in Pamona Barat District and conducting periodic forest and lake health monitoring conducted by the Conservation Group in the village namely the "Bungu Lestari" des a Meko, the "Mahapi" group in the Salukai village, the "Soga Jaya" group in the Owini village and the "Dharma Lestari" group in the village of Uranosari which is a Cepf program activity in collaboration with Burung Indonesia with the "Imunitas" Community Innovation Association as the implementor in 4 villages in the Pamona Barat District, Kabuaten Poso, namely the villages of Meko and Salukai in the coastal areas and the villages of Owini and Uransari in the upstream part that borders directly with the protected forest and Bancea Nature Tourism Park.

Beri Komentar

CAPTCHA Image

Desa

1.718

LAKI-LAKI

LAKI-LAKI1.718penduduk

1.520

PEREMPUAN

PEREMPUAN1.520penduduk

3.238

TOTAL

TOTAL3.238penduduk

Layanan
Mandiri

Hubungi Pemerintah Desa untuk mendapatkan PIN

Pemerintah Desa

Kepala Desa

I GEDE SUKAARTANA

Tidak Ada di Kantor

Sekretaris

FICTOR IMANUEL BOLE, ST

Tidak Ada di Kantor

Kepala Seksi Pemerintahan

ELFRIN MOSORI

Tidak Ada di Kantor

Kepala Seksi Kesejahteraan

YENIKE DJEPA

Tidak Ada di Kantor

Kepala Urusan Umum dan TU

HESRON MAPESU

Tidak Ada di Kantor

Kepala Urusan Perencanaan

MD WARDANA

Tidak Ada di Kantor

Kepala Urusan Keuangan

KOMANG EKO PUTRAYASA

Tidak Ada di Kantor

Kepala Dusun Balongko

BERTUS LAUALE

Tidak Ada di Kantor

Kepala Dusun Sigurompo

I KM BUDI ARSANA

Tidak Ada di Kantor

Kepala Dusun Ampire

I GEDE SETIAYASA

Tidak Ada di Kantor

Kepala Dusun Ampu-Ampu

PAULUS TANDI

Tidak Ada di Kantor

Kepala Dusun Masea

SANRA GUNAWAN SANTULE

Tidak Ada di Kantor

PIANUS WELE

Tidak Ada di Kantor

ALPRIANUS NANTE, SP

Tidak Ada di Kantor

Kepala Dusun Dumoro

PUTU KARTIKA

Tidak Ada di Kantor

PERKEMBANGAN PENDUDUK

Bulan Ini

Kelahiran

0

Orang

Kematian

1

Orang

Masuk

0

Orang

Pindah

0

Orang

Bulan Lalu

Kelahiran

0

Orang

Kematian

0

Orang

Masuk

0

Orang

Pindah

0

Orang

LAYANAN SURAT PENGANTAR

Hari Ini

5

Surat

Kemarin

0

Surat

Minggu Ini

5

Surat

Bulan Ini

18

Surat

Bulan Lalu

150

Surat

Tahun Ini

196

Surat

Tahun Lalu

258

Surat

Total

454

Surat

Agenda

Untuk sementara, belum ada agenda yang akan dilaksanakan.

Komentar
Statistik Pengunjung
Hari ini : 358
Kemarin : 591
Total Pengunjung : 183.682
Sistem Operasi : Unknown Platform
IP Address : 18.97.9.168
Browser : Tidak ditemukan
Pemerintah Desa

I GEDE SUKAARTANA

Kepala Desa


Tidak Ada di Kantor

FICTOR IMANUEL BOLE, ST

Sekretaris
Tidak Ada di Kantor

ELFRIN MOSORI

Kepala Seksi Pemerintahan
Tidak Ada di Kantor

YENIKE DJEPA

Kepala Seksi Kesejahteraan
Tidak Ada di Kantor

HESRON MAPESU

Kepala Urusan Umum dan TU
Tidak Ada di Kantor

MD WARDANA

Kepala Urusan Perencanaan
Tidak Ada di Kantor

KOMANG EKO PUTRAYASA

Kepala Urusan Keuangan
Tidak Ada di Kantor

BERTUS LAUALE

Kepala Dusun Balongko
Tidak Ada di Kantor

I KM BUDI ARSANA

Kepala Dusun Sigurompo
Tidak Ada di Kantor

I GEDE SETIAYASA

Kepala Dusun Ampire
Tidak Ada di Kantor

PAULUS TANDI

Kepala Dusun Ampu-Ampu
Tidak Ada di Kantor

SANRA GUNAWAN SANTULE

Kepala Dusun Masea
Tidak Ada di Kantor

PIANUS WELE


Tidak Ada di Kantor

ALPRIANUS NANTE, SP


Tidak Ada di Kantor

PUTU KARTIKA

Kepala Dusun Dumoro
Tidak Ada di Kantor